Tag Archive: nose job


 

  1. Snapped n crushed foam, one knock and it will separate 😦
  2. I add support to the stringer, then fill and stagger the glassing to maintain flex.
  3. Top 2 x 4oz with fully wrapped rails (that’s where the strength is).
  4. Bottom which joined together amazing well, plus 1 x 4oz .

Enjoy Andy.

#surfboard #repair #bmth

Jeff the Ding Man

Just got this Linden surfboard in with a broken nose.

IMG_20160111_120211

After #rhinoplasty, #plasticsurgery 😉

IMG_20160116_124011

The TT QUAD parabolic stringer

IMG_20160116_124935

Enjoy Dan 🙂

surfboard repairs in Bournemouth Bmth

#jeffthedingman

 

A 5’10” SURFTECH in for nose/tail n rail.

DSC00700

2015 030

DSC00701

2015 029

DSC00702

2015 031

Restoration quality work on this

SURFTECH McCoy Lazer Zap

Click on the above link for more info on the boards design.

surfboard repair BMTH.

Jack’s surfboard with a broken nose.

during Nose reconstruction surgery.

Note new stringer and foam + squared off for safety.

You’ll be pleased that a full recovery was made.

&

pure fun

caring surfboard ding repairs Bournemouth UK Dorset

SUP nose repair Bmth UK

 www.facebook.com/jeffthedingman.

A  stand up paddleboard requiring nose surgery after

coming a cropper in the shore break

at Southbourne Dorset UK.

Above during surgery.

Painted & ready for the ocean.

Stand Up Paddleboard repairs in Bournemouth Dorset UK

“Caring repairs by Jeff The Ding Man”

 www.facebook.com/jeffthedingman.

A 6ft DHD “the animal” surfboard in for a nose job..

The damage was sanded back /rebuilt and multiple layers of glass added.

Enjoy Andy.

Caring surfboard repairs in Bournemouth.

SUP repairs in Bournemouth

The infamous before shot,

Please note my customer had started his own repair using a DIY kit,

I had to remove these inferior poducts before the rebuild could start.

After re-constructive nose surgery.

A Coreban SUP repaired and ready to hit the waves.

Caring Ding sup surfboard repairs